Skip To Main Content

Find it fast

Arches Addition

Wide shot of the southwest corner of the exterior of the building
Wide shot of the cement truck pouring concrete in the foundation.
Cement truck pour cement into the foundation footings with construction workers monitoring the flow.
Close up shot of the foundation footings of the new extension of the building and dirt piled up to the left of the footings and grass on the right.
Close up of a backhoe and dirt with most of the foundation leveled and ready for concrete.
Wide shot of the southwest corner of the exterior of the building
Most of the foundation leveled and ready for concrete.
 Wide shot of the southwest corner of the exterior of the building
 Construction worker framing the walls of the new extension
 Wide shot of the southwest corner of the exterior of the building from across the street
Construction worker on the roof and bricks and foundation wall exposed of the existing building
Wood framing of the extension
Front of Arches with roofers laying new tar paper
The new extension from across the street
Wood frame of the extension
Scissor lift and fork lift sitting idle while framers hammer and nail plywood to the frame
Wide shot of the southwest corner of the exterior of the building
Wide shot of the southwest corner of the exterior of the building from across the street
Forklift sits idle while construction workers hand plywood on the wood framing
Wide shot of the southwest corner of the exterior of the building from across the street
Front of Arches
Wide shot of the southwest corner of the exterior of the building
Wide shot of the northwest corner of the exterior of the building
Wood framework inside the new extension
Construction supplies scattered on the floor of the new extension
Construction worker on a ladder working on the ceiling trusses
Wide shot of the southwest corner of the exterior of the building
Wide shot of the southwest corner of the exterior of the building
Southwest corner of the exterior of the building showing exterior doors installed
Southwest corner of the exterior of the building showing exterior doors installed
Closer shot of the southwest corner of the exterior of the building
Shop vac on the floor of additional classroom space.
Front of Arches
New unfinished classroom with drywall with a shop vac and a three step ladder in the middle of the floor
A sink counter with construction supplies in the new classroom space.
Wide shot of the southwest corner of the exterior of the building
Wide shot of the southeast corner of the exterior of the building
Exterior or new extension
Another view of the finished classroom with light fixtures, wifi, and outlet covers.
Closer shot of the southwest corner of the exterior of the building
Finished classroom with light fixtures, wifi, and outlet covers.
Wide shot of the southeast corner of the exterior of the building
Finished bathroom with white tile with tan accent tile work. ADA compliant toilet with hand bars for accessibility
A second finished white sink with blue backsplash and light blue countertop, along with mirror and hand soap dispenser on the other side a the partition is a urinal.
The completed sink area of the second classroom.
Another view of the finished classroom with light fixtures, wifi, and outlet covers.
A second finished bathroom with white tile with tan accent tile work. ADA compliant toilet with hand bars for accessibility
Wide shot of the southeast corner of the exterior of the building
The second completed classroom with light fixtures and outlet covers and illuminated exit sign above the door.
Wide shot of the southwest corner of the exterior of the building
Wide shot of the southeast corner of the exterior of the building
A table and chair have been set up in the new classroom area as a with a laptop to serve and desk.
A dustpan and broom lean up against a table with a hard hat and drills on it with fire alarm wires hanging from the ceiling.
Wide shot of the southwest corner of the exterior of the building
Finished classroom with fire alarm wires hanging from the ceiling
Closer shot of the southwest corner of the exterior of the building
Wide shot of the southeast corner of the exterior of the building
Close up shot of the west side of the exterior of the building which has a scissor lift and two laborers working on siding
Close up shot of the southwest corner of the exterior of the building
Close up shot of the west the exterior of the building showing the bricks of the old building and siding of the new extension.
Wide shot of the southwest corner of the exterior of the building from across the street
Wide shot of the southwest corner of the exterior of the building
Picture of two laborers cutting more siding to hang on the extensions exterior.
Wide shot of the southeast corner of the exterior of the building with half siding and half Typar paper
Wide shot of the south side of the exterior of the building with half siding and half Typar paper
 Wide shot of the southwest corner of the exterior of the building
Front of Arches
Finished classroom with fire alarm and wifi hotspot in ceiling
 Exterior or new extension with sod
Close up shot of the southwest corner of the exterior of the building
Hall walls and lighting installed
Sheetrocked walls of the unfinished bathroom
Interior rooms sheetrocked
Boxes of construction supplies on the counter and in a storage area
Construction supplies in a new handicap bathroom
Newly installed bathroom stalls
Bathroom stall door and hand towel dispenser in the second new bathroom.
A second completed shower with hand bar for ADA accessibility and two shower heads one fixed and one detachable.
Looking down the hall into the new extension
Finished white sink with blue backsplash and light blue countertop, along with mirror and hand soap dispenser.
Ladder in a storage area that is close to finished.
Completed shower with hand bar for ADA accessibility and two shower heads one fixed and one detachable.
Hallway into the new extension with red wires hanging from the ceiling.
Ladder against the wall in a storage area that is close to finished.
Another look at the soffit underneath the roofing of the new extension.
A look at the soffit underneath the roofing of the new extension. Fire alarm wires are hanging from the exterior of the building.
Finished hallway in new extension with lighting, doors, fire alarm and fire extinguisher
Storage area that contains leftover paint and other construction supplies

Arches is a post-secondary learning center that teaches a variety of skills to help learners with special needs, aged 18-21, become contributing adults. 

Arches focuses on moving learners towards greater autonomy in the home, community, and workplace through the development of self-advocacy skills.

10-25-2024

 Wide shot of the southwest corner of the exterior of the building
Close up shot of the southwest corner of the exterior of the building
Front of Arches
 Exterior or new extension with sod
Finished hallway in new extension with lighting, doors, fire alarm and fire extinguisher
Finished classroom with fire alarm and wifi hotspot in ceiling
Storage area that contains leftover paint and other construction supplies

10-11-2024

Wide shot of the southwest corner of the exterior of the building
Wide shot of the southwest corner of the exterior of the building from across the street
Close up shot of the southwest corner of the exterior of the building
Close up shot of the west side of the exterior of the building which has a scissor lift and two laborers working on siding
Close up shot of the west the exterior of the building showing the bricks of the old building and siding of the new extension.
Picture of two laborers cutting more siding to hang on the extensions exterior.
Wide shot of the southeast corner of the exterior of the building with half siding and half Typar paper
Wide shot of the south side of the exterior of the building with half siding and half Typar paper

10-04-2024

Wide shot of the southwest corner of the exterior of the building
Finished classroom with fire alarm wires hanging from the ceiling
Ladder against the wall in a storage area that is close to finished.
A dustpan and broom lean up against a table with a hard hat and drills on it with fire alarm wires hanging from the ceiling.
A look at the soffit underneath the roofing of the new extension. Fire alarm wires are hanging from the exterior of the building.
Another look at the soffit underneath the roofing of the new extension.
Closer shot of the southwest corner of the exterior of the building
Wide shot of the southeast corner of the exterior of the building

09-27-2024

Wide shot of the southwest corner of the exterior of the building
Hallway into the new extension with red wires hanging from the ceiling.
A table and chair have been set up in the new classroom area as a with a laptop to serve and desk.
Wide shot of the southeast corner of the exterior of the building

09-19-2024

Closer shot of the southwest corner of the exterior of the building
Looking down the hall into the new extension
Ladder in a storage area that is close to finished.
Finished classroom with light fixtures, wifi, and outlet covers.
Another view of the finished classroom with light fixtures, wifi, and outlet covers.
Another view of the finished classroom with light fixtures, wifi, and outlet covers.
Finished bathroom with white tile with tan accent tile work. ADA compliant toilet with hand bars for accessibility
Completed shower with hand bar for ADA accessibility and two shower heads one fixed and one detachable.
Finished white sink with blue backsplash and light blue countertop, along with mirror and hand soap dispenser.
A second finished bathroom with white tile with tan accent tile work. ADA compliant toilet with hand bars for accessibility
A second finished white sink with blue backsplash and light blue countertop, along with mirror and hand soap dispenser on the other side a the partition is a urinal.
A second completed shower with hand bar for ADA accessibility and two shower heads one fixed and one detachable.
The second completed classroom with light fixtures and outlet covers and illuminated exit sign above the door.
The completed sink area of the second classroom.
Wide shot of the southeast corner of the exterior of the building
Wide shot of the southeast corner of the exterior of the building

09-09-2024

Wide shot of the southwest corner of the exterior of the building
Front of Arches
Exterior or new extension
New unfinished classroom with drywall with a shop vac and a three step ladder in the middle of the floor
Boxes of construction supplies on the counter and in a storage area
Newly installed bathroom stalls
Construction supplies in a new handicap bathroom
Bathroom stall door and hand towel dispenser in the second new bathroom.
Shop vac on the floor of additional classroom space.
A sink counter with construction supplies in the new classroom space.
Closer shot of the southwest corner of the exterior of the building
Wide shot of the southeast corner of the exterior of the building

08-15-2024

Wide shot of the southwest corner of the exterior of the building
Wide shot of the southwest corner of the exterior of the building
Hall walls and lighting installed
Sheetrocked walls of the unfinished bathroom
Interior rooms sheetrocked
Southwest corner of the exterior of the building showing exterior doors installed
Southwest corner of the exterior of the building showing exterior doors installed

07-16-2024

Wide shot of the southwest corner of the exterior of the building
Wide shot of the southwest corner of the exterior of the building from across the street
Front of Arches
Wide shot of the northwest corner of the exterior of the building
Wood framework inside the new extension
Construction supplies scattered on the floor of the new extension
Construction worker on a ladder working on the ceiling trusses

06-26-2024

Wide shot of the southwest corner of the exterior of the building
Forklift sits idle while construction workers hand plywood on the wood framing
Wide shot of the southwest corner of the exterior of the building from across the street
Wood framing of the extension
Front of Arches with roofers laying new tar paper
The new extension from across the street
Scissor lift and fork lift sitting idle while framers hammer and nail plywood to the frame
Wood frame of the extension

06-24-2024

 Wide shot of the southwest corner of the exterior of the building
 Construction worker framing the walls of the new extension
 Wide shot of the southwest corner of the exterior of the building from across the street
Construction worker on the roof and bricks and foundation wall exposed of the existing building

06-12-2024

Wide shot of the southwest corner of the exterior of the building
Close up of a backhoe and dirt with most of the foundation leveled and ready for concrete.
Most of the foundation leveled and ready for concrete.

05-28-2024

Wide shot of the southwest corner of the exterior of the building
Close up shot of the foundation footings of the new extension of the building and dirt piled up to the left of the footings and grass on the right.
Cement truck pour cement into the foundation footings with construction workers monitoring the flow.
Wide shot of the cement truck pouring concrete in the foundation.